Sizewell B Response Centre

Birch Floor Screeding were proud to be part of this interesting project. After the catastrophic earthquake in Fukushima that led to the meltdown of the nuclear
power plant it was deciding the an emergency response centre would be built costing of £180 million. Our works involved installing over 2,000m2 of Isocrete Industrial Top wearing floor screeds and Isopol SBR floor screedsall fully
bonded with Flowcrete Hydraseak and M Bond Extra. 